about solar

[su_spoiler title=”Permitting” style=”fancy”]Permitting

  • DCRA Solar PV Permit Guidelines NEW! as of 10/20/14. Changes include a new permit fee structure and reduced fees, an easier adjoining property notification process, and the acceptance of electronic instead of “wet” engineering stamps.

Permitting issues? Contact:

  • Keith Winston, Green Building Code Inspector, Permitting & Inspections (DCRA), 202-442-4416
  • Kimberly A. Newcomer, Green Program Analyst (DCRA),  202-442-9554
  • David M. Epley, Green Building and Sustainability Coordinator, Permitting & Inspections (DCRA),  202-442-4587
  • Emil King, Policy Analyst – Energy Administration (DDOE), 202-870-7248
[/su_spoiler] [su_spoiler title=”Interconnection” style=”fancy”]


[su_spoiler title=”Solar Incentives in DC” style=”fancy”]


[su_spoiler title=”Will Solar Add Value to my Home?” style=”fancy”]Yes! Read the studies below for more details:

Please share!